5 Mistakes to Avoid With General Contractor
By the time most homeowners realize something went wrong with their contractor, they’ve already signed the check. The five most expensive mistakes aren’t about the wrong tile or the wrong paint color – they’re contractual and logistical errors made in the first 48 hours of a project, before a single tool is unpacked. Every one of them is preventable if you know what to ask for. If you’d rather not sort through a stack of bids alone, call (844) 972-4834 and we’ll walk you through what a fair contract looks like.
Mistake 1: Accepting a Verbal Estimate

A verbal estimate is not a price. It’s a conversation. And in Nevada, a number spoken across a kitchen table has no legal weight behind it once the invoice shows up with a different figure. We’ve watched homeowners in Sunrise Manor get a $14,000 kitchen figure over the phone, then receive a $21,000 invoice after demo revealed “unexpected conditions” that were never specified as line items.
Why does this happen? Because without a written scope, the contractor decides what counts as “normal” and what counts as an extra. There’s no document to point to. No contract to enforce.
What a written price actually contains
- A fixed dollar figure, not a range with “starting at” in front of it
- Line-item pricing for labor and materials separately
- Named exclusions (what’s NOT covered, in plain English)
- Change-order procedures – how an unforeseen issue gets priced and approved before it’s billed
- Payment milestones tied to completed work, not calendar dates
Every project we take on gets a written number before any work starts. Not a ballpark. Not an email that says “roughly.” A number you can hold us to. Kitchen remodels in Sunrise Manor typically run $18,000 – $55,000 depending on layout and cabinet line, and those figures are written down before we pull a permit. If the number isn’t on paper, it isn’t real.
Mistake 2: Confusing Licensed, Bonded, and Insured
These three words get used interchangeably by contractors and by homeowners, and they protect you from three very different things. Confusing them is the second most expensive mistake we see. Here’s what each one actually means:
Licensed
A licensed contractor has passed the state’s trade exam and is authorized to pull permits and perform the work legally. If your contractor isn’t licensed, your permit application gets rejected and your inspection fails. Worse, if they get caught unlicensed mid-project, you’re the one left with an unpermitted build and an insurance company that won’t cover it. Nevada requires a license number on every contract – ask for it before signing anything.
Bonded
A surety bond is a fund a contractor pays into. If they walk off the job or fail to complete the work they were paid for, you can file a claim against the bond to recover some of your money. It’s a backstop for bad behavior, not a blanket. Coverage amounts vary, and the bond is not a substitute for a written contract.
Insured
General liability insurance covers third-party property damage – if a worker breaks your window or floods your subfloor, this pays. Workers’ compensation covers injuries to the crew on your property. If a crew member falls off a ladder in your bathroom and the contractor has no workers’ comp, you can be liable as the property owner in many cases. Ask for a certificate of insurance naming you as the certificate holder. A legitimate contractor will email it within the hour.
Mistake 3: Paying Too Much Upfront

We’ve heard every version of this. A Sunrise Manor homeowner hands over 40% of a $30,000 bathroom remodel up front, the contractor shows up for two days, and then the phone goes silent. The cash is gone. The bathroom is a hole.
Most reputable contractors don’t need more than 10 – 15% upfront to secure materials and schedule. Not 30%. Not 50%. Here’s what a reasonable draw schedule looks like:
- 10 – 15% deposit: secures materials and locks your start date
- 25 – 30% at demo completion: verifies work started
- 25 – 30% at rough-in inspection passed: verifies substrate, plumbing, and electrical are done correctly
- 20 – 25% at tile and fixtures installed: verifies finish work is underway
- Final 10 – 15% at walkthrough and sign-off: held until you’re satisfied
The exact percentages vary by project size, but the principle holds: money follows completed, verified milestones. If a contractor asks for half the job upfront with no milestone schedule tied to inspections, that’s not a deposit – that’s a warning. Every line on that schedule should be written into the contract.
Mistake 4: No Defined Scope of Work
“The general contractor does the bathroom” is not a scope of work. It’s a sentence that means nothing and guarantees friction later. A line-item scope spells out every task, every material, and every brand, so there’s no room for “we assumed you wanted the upgraded line.”
Here’s the difference. A vague scope says “install countertops and cabinets.” A real scope says “fabricate and install Cambria quartz in the agreed color with a standard edge, install KraftMaid cabinets in the agreed door style and finish, include crown molding, and specify the sink cutout location.” The second one is a document. The first is a hope.
What every line-item scope should specify
- Materials by brand and model – KraftMaid vs. Wellborn vs. custom, not just “cabinets”
- Demolition limits (is the contractor hauling away old materials or not?)
- Permit responsibility (who pulls it, who pays the fee)
- Substrate and prep work (the layer behind your tile – what goes under it)
- Fixture brands and specifications (Kohler, Moen, whatever you agreed to)
- Cleanup and job-site standards, in writing
- Timeline with a defined arrival window, not a vague “we’ll be there soon”
We pull permits and pass inspections on every project we take – that’s part of The Kingswell Way, and it’s written into the contract. So is the cleanup standard, so you know exactly what your job site looks like at the end of each day. If you’ve been burned before by a contractor who showed up on the wrong day, you already know how much a written arrival window is worth.
Mistake 5: Skipping the Post-Project Walkthrough

The walkthrough is the single most important document most homeowners never ask for. It’s the moment you and the contractor walk the finished job together, check every line item against the scope, and sign off. It’s also, typically, the moment the guarantee clock starts ticking.
If you skip it, you can’t prove what condition the project was delivered in. If a cabinet door starts sagging three months later, you have no signed document confirming the door was installed straight in the first place. If the grout cracks in your tile, you have nothing tying the failure to the original install rather than “something you did.”
What a real walkthrough covers
- Every scope line item verified against the finished work
- Doors, drawers, and hardware tested for smooth operation
- Punch list documented in writing and signed by both parties
- Warranty documents handed over (manufacturer warranties for Cambria quartz or James Hardie siding, for example)
- Company guarantee in writing, with the term and coverage clearly stated
- Payment of the final milestone released only after the punch list is cleared
Our 365-Day Done Right Promise is the backstop: if the work fails inside the guarantee period, we come back and fix it at no charge. But that promise only activates if we can prove what we handed you and when. Skip the walkthrough and you’ve left a real guarantee on the table, unwritten and unenforceable.
When to Call a Pro Instead of Managing the Process Yourself
Some homeowners can run a general contractor relationship on their own. Most can’t – and the honest reason is time, not skill. If you work full-time, you don’t have fourteen hours a week to compare bids, check licenses against the state database, verify insurance certificates, review draw schedules, and coordinate inspections. The five mistakes above are all preventable. They’re just not preventable in your spare time.
If you’re in Sunrise Manor and you’re staring at a bid you don’t fully trust, the right move isn’t signing – it’s getting a second written number to compare against. Call us at (844) 972-4834 and we’ll give you one. Written, line-item, no pressure, free.
Related services in Sunrise Manor: Kitchen Remodeling in Sunrise Manor and Bathroom Remodeling in Sunrise Manor. For a full overview of who we are and what we do, visit Penhallow Remodeling Sunrise Manor home.
The Bottom Line
Every one of these five mistakes happens before the first nail goes in. Get a written price, understand the difference between licensed, bonded, and insured, structure your payments to follow milestones, insist on a line-item scope, and do the walkthrough with a signature. That’s the whole list. Do those five things and you’ve eliminated most of the ways a contractor relationship goes sideways in Sunrise Manor.
If you want a second written estimate to compare against the bid you’re holding, or you’re starting fresh and want a contractor who puts everything in writing before any work starts, Penhallow Remodeling Sunrise Manor offers free estimates. Call (844) 972-4834 – a real person answers, day or night. Every project comes with a written price, background-checked technicians in uniform, and the 365-Day Done Right Promise in writing. Background-checked and uniformed means you know who’s walking into your home. The written guarantee means you know what happens if something goes wrong. Most homeowners never get either.
If you’re still mapping out the full project, our General Contractor in Sunrise Manor page covers how we run a project from first estimate to final walkthrough.
Frequently Asked Questions
Is a verbal estimate legally binding in Nevada?
No. A verbal estimate is not a contract, and it doesn’t lock a contractor to a price. Once you sign a written contract, that document controls – and if it doesn’t include a fixed price, the contractor can bill for “extras” beyond the verbal figure. Get every number in writing before signing. Call (844) 972-4834 for a written estimate at no charge.
What percentage should I pay a general contractor upfront in Sunrise Manor?
10 – 15% is standard for a deposit. Anything above that without a draw schedule tied to completed milestones and passed inspections is a red flag. The payment structure should follow completed and verified work, with the final 10 – 15% held until you’ve done the walkthrough and signed off. Call (844) 972-4834 if you want us to review a draw schedule before you sign it.
What’s the difference between licensed, bonded, and insured – and which one matters most?
All three matter, but they protect against different things. Licensed means the contractor is legally authorized to pull permits and do the work. Bonded means there’s a surety fund you can claim against if the contractor walks off the job. Insured means liability and workers’ comp coverage protects you if someone is hurt or property is damaged on your property. Ask for the license number and certificate of insurance before signing anything.
How long does a bathroom or kitchen remodel take in Sunrise Manor?
A full bathroom remodel typically runs three to five weeks; a kitchen remodel, five to eight weeks, depending on cabinet line, countertop material, and permit inspection timing. The exact timeline should be written into your contract with a defined arrival window, not left as a verbal promise. Call (844) 972-4834 for a free written estimate that includes the schedule.
Written by the team at Penhallow Remodeling Sunrise Manor.